Documentation / TEST-001
Issue boardGitLab source
TEST-001 Planned contract

M1 acceptance: DB/table suite and independent restart

Do not claim CI points from the five existing CLI smoke tests. They only exercise the initial scaffold.

Contract

Field Value
Specification TEST-001
Module verification
Scope Required implementation or delivery
Milestone M1, due 2026-12-06
Owner role Shared — choose one MR owner
Implementation Planned; scaffold only
Contract review Team review required before implementation

Open GitLab issue

Interface

make check + local public runner

These are proposed C++ design contracts, not an already implemented API. Shared types and ownership define the intended module boundaries.

Dependencies

Acceptance checklist

  • Pass system and table together for 12 raw points with no disabled failures
  • Separate process creates/inserts, exits normally, reopens and selects same values
  • Record Linux toolchain, commit and output evidence in the MR

Verification

Completion rule

Link this spec and its GitLab issue in an MR into develop. Include relevant Linux evidence, obtain the other teammate’s review, merge, delete the feature branch, and close the issue. A page describes intended behavior; the GitLab issue and merged code determine completion.

DBS 005 · Specification v1 · Team review required for proposed interfaces.
Engine behavior is planned; implementation progress lives in GitLab.